Coimbatore gets strong sunshine for most of the year, and many families here now look at rooftop solar to cut their electricity bills. The technology is mature, but the results depend on choosing the right size, a careful installer and the correct paperwork. This guide explains the choices and the checks, in plain words.
Solar panels on your roof produce DC electricity in daylight. An inverter converts it to the AC power your home uses. What you do not use at that moment flows out to the grid through a bi-directional (net) meter, and the exported units are set off against the units you draw from the grid at night.
There are three common types of system:
| Type | How it works | Good for |
|---|---|---|
| On-grid | Connected to the grid, no batteries; exports extra power | Lowest cost per unit; eligible for the national subsidy and net metering |
| Off-grid | Runs on batteries, not connected to the grid | Farms or places with no reliable supply |
| Hybrid | On-grid plus batteries for backup | Homes that want power during cuts |
A plain on-grid system shuts down during a power cut. That is a safety rule to protect line workers, not a fault.
The central government scheme PM Surya Ghar: Muft Bijli Yojana supports rooftop solar for homes. As of September 2026, the central subsidy for residential systems is:
The subsidy is paid into the homeowner's bank account after the system is installed, inspected and commissioned. To claim it, you apply on the national portal (pmsuryaghar.gov.in) and use a vendor registered for the scheme. Scheme rules and amounts can change, so check the portal for the current terms before you sign anything, and do not rely only on a salesperson's figures.
In July 2024 TANGEDCO was split into separate companies, and electricity distribution in Tamil Nadu is now handled by the Tamil Nadu Power Distribution Corporation Limited (TNPDCL). For an on-grid rooftop system, the distribution company processes the connection, inspects the installation and fits the net meter. Your vendor usually handles the paperwork, but the application is in your name, so keep copies of everything.
Many homes find 2 to 3 kW enough, but a large family with ACs may need more. Bigger is not always better: check how exported units are credited under the current Tamil Nadu rules before oversizing.
Get at least two written quotes and compare them item by item.
Dust is the main enemy of solar output in Coimbatore, especially in the dry months and near busy roads or construction. Rinse the panels with plain water early in the morning or in the evening, when they are cool, and avoid harsh brushes or detergent. Check the daily generation on the inverter app; a sudden drop usually means dirt, shade or a fault. Keep the inverter in a shaded, ventilated place.
Solar works best when paired with efficient appliances. A well-serviced AC uses less power; see our guide on choosing AC service in Coimbatore. If you mainly want backup during power cuts rather than bill savings, a hybrid system or a home inverter may suit you better.
Gather a year of electricity bills, check the current scheme details on pmsuryaghar.gov.in, and invite two registered vendors for a site visit. Compare their written quotes line by line - components, structure, earthing, warranty and who handles the TNPDCL paperwork. You can also find solar installers listed in the Kovai Yellow Pages directory.
Under PM Surya Ghar: Muft Bijli Yojana, as of September 2026 the central subsidy for residential rooftop solar is Rs 30,000 per kW for the first 2 kW and Rs 18,000 for the third kW, up to Rs 78,000 for 3 kW or more. Check the current figures on pmsuryaghar.gov.in before you sign.
For an on-grid system with net metering, yes. The application goes through the national portal and the distribution company, which in Tamil Nadu is TNPDCL (formerly part of TANGEDCO). The company inspects the system and fits the net meter.
Look at your bi-monthly electricity bills for a year and find your average units per month. A registered vendor can then size the system for your usage and roof. Many homes find 2 to 3 kW enough, but it depends on your consumption and the shade-free roof area.
A plain on-grid system switches off during a power cut for the safety of line workers. If you need backup, ask about a hybrid system with batteries, which costs more.